A creative full-stack developer and design-driven engineer passionate about building accessible, performant web experiences. I love combining clean code with thoughtful design to create interfaces that work beautifully for everyone.
Let's Connect!

CourseInsights is a web application that automates and visualizes course survey results. It processes CSV survey data into structured PDF reports and provides an accessible interface for instructors and administrators to track course performance and student engagement.

BCPM Network is a professional community website for the BC Proteomics and Metabolomics Network. I designed and developed the site to showcase research, workshops, symposia, and resources, while aligning with the networkβs branding and ensuring accessibility across devices.

The Concept Mapping Tool is an open-source platform for analyzing and visualizing complex data in healthcare research. It supports qualitative feedback analysis, multidimensional scaling (MDS), and hierarchical clustering to uncover patterns and improve thematic clarity, reducing manual analysis by 50%.

AI-powered search bar with voice and visual search, optimized with Next.js SSR for fast performance and platform integration with Shopify, WordPress, and Wix.

Multi-stage autonomous robot capable of wall following, line following, and 360Β° object detection using embedded systems and sensor fusion.

Accessibility widget ensuring ADA and WCAG 2.1 compliance with keyboard navigation, high contrast modes, and optimized performance.

UX research-driven responsive website built with Framer, featuring smooth animations and cross-browser compatibility.

UX researched website designed in Figma, coded in responsive HTML/CSS with SEO best practices and intuitive navigation.

Recommendation engine using collaborative and content-based filtering with TensorFlow, improving VR experience suggestions by 20%.
